North Peace Arena - Roof Truss Repairs

Start Date: Summer 2021

End Date: Fall 2021

Project Status:

Under construction

Category: Facilities, Buildings & Parks

Budget: $1.08 million

Project Description:

During the 2020 exterior cladding upgrade project at the North Peace Arena, the contractor discovered that the building's roof trusses were out of alignment ranging from 9 - 12 inches, depending on the location being measured. After consulting with a structural engineering firm, it was determined the roof alignment issues need to be repaired before the building could be re-opened. This project will correct these roof alignment issues. 

Contact Information:

Curtis Redpath, Civic Properties Manager