RCMP Detachment Construction Photos
Additional images will be added as construction progresses.
-
Rendering - Aerial view
-
Rendering - East view
-
Rendering - Northeast view
-
Rendering - Northeast Corner view
-
Rendering - Southeast Corner view
-
Excavation Activities
-
Pile Installation - Equipment
-
Pile Installation
-
Pile Installation
-
Pile Installation
-
Pile Installation - Aerial
-
Foundation Piles Installed
-
Foundation Pile Cap Installation
-
Foundation Pile Cap Installation
-
Foundation Pile Cap Installed
-
Foundation Pile Cap Installed
-
Backfill Activities
-
Foundation Formwork
-
Foundation Formwork
-
Foundation Formwork
-
Utilities Installation
-
Utilities Installation
-
Utilities and Geothermal Installation
-
Utilities and Geothermal Installation
-
Geothermal System
-
Foundation Rebar
-
Foundation Formwork
-
Foundation Formwork
-
Foundation Formwork
-
Foundation Formwork
-
Foundation Formwork
-
Foundation Formwork and Insulation
-
Foundation Concrete
-
Utilities Installation
-
Foundation Pour
-
Foundation Formwork
-
Foundation Formwork
-
Foundation Formwork
-
Foundation Slab Preparation
-
Temporary Parking Lot Improvements
-
Backfill Grade Beams
-
Concrete Slab Preparation
-
Concrete Slab Preparation
-
Exterior Foundation Waterproofing
-
Concrete Slab Pour
-
RCMP-Kinsol (7).jpg
-
Off-site Mass Timber Panel Fabrication
-
Off-site Mass Timber Panel Fabrication
-
Off-site Mass Timber Panel Fabrication
-
Off-site Mass Timber Panel Fabrication
-
Off-site Mass Timber Panel Fabrication
-
Off-site Mass Timber Panel Fabrication
-
Water Line Trenching
-
Main Floor Joist System Installation
-
Main Floor Joist System Installation
-
Main Floor Joist System Installation