2021 Watermain Looping

Start Date: Summer 2021

End Date: Fall 2021

Project Status:

Under construction

Category: Water & Sewer

Budget: $765,000

Project Description:

To improve the reliability and efficiency of the water delivery system and improve fire hydrant coverage, the City undertakes annual watermain looping projects. This year, the following areas have been identified:

  • The installation of a watermain on the north side of 100th Avenue from 84th to 86th Street.
  • The installation of a watermain in the alley between Alaska Road North and 94th Avenue tying into the watermain on 94th Avenue.
  • The installation of watermain in the alley between 100th Avenue and 99th Avenue at 104th Street tying into the watermain on 104th Street.
  • The installation of fire hydrants on 99th Avenue between 102nd Street and 106th Street and at 97 Avenue and 86A Street.
Contact Information:

Jim Stewart, Engineering Manager